The work on the third room along the long hallway, has gotten to be commonplace by now. We replaced three walls of the four with sheetrock, replaced all the electrical plugs and the switch to the overhead light fixture, added a second switch for the fan motor, As with most rooms, we have installed Ethernet cable, land phone cable, and coaxial cable. We removed the generic ceiling tiles and replaced with tin-type ceiling tiles, which we have used in the other two bedrooms in the bedroom section of the lower floor. We removed the hollow core wooden closet doors and replaced with mirrored glass doors and we installed new vertical blinds for the patio doors, which open to the pool area and gazebo. |
>
I installed some of the Saltillo tiles in this bedroom. The tiles are hand-made in the Saltillo Region of Mexico and several coats of a sealer bring out the colors as well as seal the tiles. |
|
|